Bathroom Progress Part 1
So, five months after I started to 3 week project, I am ready to sart painting.
These pics show the progress as of about a month ago. The walls were framed, the news drains were run, and the wood subfloor was installed. I actaully am at the painting stage now, but I don't have those pictures yet. That will be the next post.
The new drain...
A couple views of the walls...
A couple inside walls and the ceiling. You can see that I used one inch sleepers on the wall to save space behind the toilet...
Framed in the duct...
Tapped into the main stack for the sink...
I used one inch sleepers on the floor shimmed to level. Now I have to figure out how to deal with this transition...
Next up... a room ready for painting.